Construction

Left to Do Feb 6

BazAudi

Swallech

  • Interior concrete sealed
  • Two sets of interior stairs
  • Get electrician on schedule to finish before end of month
  • All window & door trim completed
  • All window & door trim sealed
  • Install all door & window hardware
  • Install wood stove
  • Library loft ladder

Exterior

  • East exterior siding of house
  • Finish hooking up drainage
  • Decking around bedroom patio
  • East side crawl space

Living Room

  • Trim
  • Baseboard

Bed Room

  • Finish floor in bed room
    • Strip along outside wall
    • step up in entry
  • Finish trim

Closet

  • Trim inside
  • Hanging bars?

Bath Room

  • Finish bathroom tiling
  • Trim around windows
  • Install fixtures

Kitchen

  • Install kitchen appliances
  • Install plumbing fixtures
  • connect to septic tank
  • counter tops
  • Shelves
  • Paint patches around shelve support

Upstairs

  • storage space doors
  • upper landing bench
  • cork floor

Painting

  • Painters ladder leaves marks
  • painting touchups for blemishes

list of details that need fixing

  • Kitchen cabinet not closing due to gas pipe
  • Bedroom cabinet sliders need to be lowered
  • Need to get a larger piece of wood to cover lowered slider tracks
kielhaven/construction.1454880984.txt.gz · Last modified: 2016/02/07 13:36 by gunn
CC Attribution-Share Alike 3.0 Unported
www.chimeric.de Valid CSS Driven by DokuWiki do yourself a favour and use a real browser - get firefox!! Recent changes RSS feed Valid XHTML 1.0