Construction
Left to Do Feb 6
BazAudi
Swallech
Exterior
Living Room
Bed Room
Kitchen
Upstairs
Painting
list of details that need fixing
Construction
Left to Do Feb 6
BazAudi
Order mirror for Bathroom
plain no frame
Door hardware for cabinets
Get Steve to paint rest of house & pole building
Drainage around pole building
Storage space in garage
Audrey's ideabook on houzz
Swallech
Interior concrete sealed
Two sets of interior stairs
Get electrician on schedule to finish before end of month
All window & door trim completed
All window & door trim sealed
Install all door & window hardware
Install wood stove
Library loft ladder
Exterior
East exterior siding of house
Finish hooking up drainage
Decking around bedroom patio
East side crawl space
Living Room
Trim
Baseboard
Bed Room
Finish floor in bed room
Strip along outside wall
step up in entry
Finish trim
Closet
Trim inside
Hanging bars?
Bath Room
Finish bathroom tiling
Trim around windows
Install fixtures
Kitchen
Backsplash -
Ultimate Guide to Backsplashes
Install kitchen appliances
Install plumbing fixtures
connect to septic tank
counter tops
Shelves
Paint patches around shelve support
Upstairs
storage space doors
upper landing bench
cork floor
Painting
Painters ladder leaves marks
painting touchups for blemishes
list of details that need fixing
Kitchen cabinet not closing due to gas pipe
Bedroom cabinet sliders need to be lowered
Need to get a larger piece of wood to cover lowered slider tracks
Drainage in front of house